Property InformationYaesu Daibiru Building Reconstruction PlanScheduled for completion in June 2025.

Construction scheduled for completion at the end of June 2025. Directly connected to Tokyo Station, excellent access with a four-minute walk. Located in the Yaesu area, where continued improvements in terms of convenience and increasing footfall can be anticipated owing to ongoing redevelopment and the consolidation of express bus and other services. With its imposing stone exterior, the property inherits the traditions and history of the former building. A high-grade specification building with facilities including a seismic isolation structure at its midway point and a seven-day capacity emergency power generator as well as multiple environmental certifications.

Access

  • 4 min. on foot from JR Tokyo Sta.
  • 4 min. on foot from Kyobashi Sta. on the Ginza Line

Features and facilities

  • Directly connected to underground shopping area
    Directly connected to underground shopping area
  • 4 min. on foot from station
    4 min. on foot from station
  • Shared offices
    Shared offices
  • CO2-free electricity
    CO2-free electricity
  • Access control using IC cards
    Access control using IC cards
  • Emergency power generator that can operate for 168 hours
    Emergency power generator that can operate for 168 hours
  • Convenience store
    Convenience store
  • Retail stores
    Retail stores
  • Rental conference rooms
    Rental conference rooms
  • Parking lot
    Parking lot
  • Seismic vibration isolation
    Seismic vibration isolation

Property overview

Location 1-1-1, Kyobashi, Chuo-ku, Tokyo
Nearest station 4 min. on foot from JR Tokyo Sta.
5 min. on foot from Nihombashi Sta. on the Tozai Line and Ginza Line
4 min. on foot from Kyobashi Sta. on the Ginza Line
8 min. on foot from Takaracho Sta. on the Toei Asakusa Line
8 min. on foot from Tokyo Sta. on the Marunouchi Line
Completion Jun. 2025 (scheduled)
Gross floor area 22,655.19 m² (6,853.19 tsubo)
Scale 11 floors above ground, 3 floors below ground
Structure Mid-story seismic isolation structure
Steel-frame structure (partly steel-frame ferroconcrete structure, ferroconcrete structure)
Design and supervision NIKKEN SEKKEI LTD
Construction KAJIMA CORPORATION
Certifications and awards CASBEE Wellness Office Certification: Plan to obtain S rank certification, the highest rank
Plan to obtain “ZEB Oriented” BELS certification
Plan to obtain “Gold” LEED certification
Parking lot 52 cars (monthly and hourly rental)
Rental conference room Available

Overview of rental rooms and facilities

Standard floor area 1,279.56 m² (387.07 tsubo)
Power receiving system Two 6.6kV lines
Emergency power generator In the event of a power outage, the building’s generators can supply 15 VA/m² of power (approx. 7 days)
Space for tenant generators has been secured (two 130 kVA units)
Ceiling height 2,900 mm
Raised floor 100 mm
Floor load 500 kg/m² (heavy duty zone: 1,000 kg/m²)
Outlet power supply capacity 60 VA/m²
Air-conditioning unit Air-conditioning method: Multi-split building air conditioning system
Air-conditioning zoning: 28 zones per floor
Natural ventilation: Natural ventilation openings are installed around windows on standard floors
Expandability: Space for installation of outdoor units is available on each floor
Security Access control using contactless IC card (24-hour operation)

Floor plan of standard floor

Floor plan of standard floor